Install the support immediately above the offset or at 9 14 m 30 intervals.
How to install selkirk chimney support.
Selkirk also manufactures ceiling.
Frame on all 4 sides a level square opening.
The chimney penetrates a roof.
See figures 2 3 and 4.
In this video i am installing a chimney in a cottage if you have never installed a chimney before you should contact a professional chimney installer or che.
Apply a bead of silicone caulk to seal the joint between the storm collar and the chimney fig.
Approval of this factory built chim ney is based on the use of parts supplied by selkirk metalbestos and installation in accordance with these instructions.
Figures 5 6 show the 2 most common types of decorator ceiling support installation.
Strength safety and performance are at the heart of every product we make.
Rafter radiation shield installation roof support installation roof flashing installation roof guy installation maintenance and cleaning of chimney chart 1 offset chimney installation chart 2 chimney height above the roof chart 3 connector pipe clearances cathedral support replacement parts list installation record product registration.
Simply join the halves around the chimney fig.
16 and nail the shield to the framing fig.
13 m of chimney sections all of which must be installed above the support.
Transitioning from single wall black stove pipe to insulated double wall class.
Offset support or an interior resupport.
Then place the collar over the shield fig.